Leganttis Font
✎ Regular
📄 TrueType
🔢 58 chars
⬇ 73
✅ Free
✅ Web Font
Leganttis Description
This font features a decorative and elegant script style with a playful yet sophisticated flair. The uppercase letters are characterized by their intricate loops and swirls, adding a sense of movement and grace. The lowercase letters maintain a consistent flow, with smooth curves and a slightly whimsical touch. The font exhibits a medium contrast in stroke thickness, providing a balanced and harmonious appearance. Its unique style makes it suitable for creative and artistic projects, where a touch of elegance and personality is desired. The spacing between characters is normal, ensuring readability while maintaining its decorative appeal.
Fonts by Gie Studio - Giwi Dodo - Personal-use only. For commercial use please contact owner.
This font includes 58 characters. Click on any character to see details.
Numbers & Symbols
LEGANTTIS UPPERCASE
LEGANTTIS LOWERCASE
LEGANTTIS OTHER CHARS
GALLERY EXAMPLES
No similar fonts data yet.
Business Card
Social Header
Logo
Poster
Information
| Name | Leganttis |
| Format | TrueType (.ttf) |
| File | Leganttis.zip |
| Weight | Regular |
| Version | Version Version 1.00;November 7, 2019;FontCreator 11.0.0.2388 32-bit |
| No. of Characters: | 58 |
| Downloads | 73 |
| Added | 2023-01-18 |
| Updated | 2024-11-24 |
| Categories | Regular |
| Bold | No |
| Italic | No |
| Width | Normal |
| Character Spacing | Monospaced |
| Contrast | Medium |
| Overall Style | Decorative |
| Use Case | Logos, Invitations, Artistic Designs |
| Proposed Projects | Ideal for wedding invitations, greeting cards, branding, and artistic designs requiring a touch of elegance. |
| Is Fixed Pitch | No |
| Web Font | Available |
| License | Free for personal use |
Fonts by Gie Studio - Giwi Dodo - Personal-use only. For commercial use please contact owner.
Tags
💻 Windows
- Extract ZIP
- Right-click .ttf -> Install
🍎 macOS
- Extract ZIP
- Double-click .ttf -> Install Font
Leganttis
Free · TrueType
| Name | Leganttis |
| Type | TrueType |
| Characters | 58 |
| Downloads | 73 |
| Added | 2023-01-18 |
| Web Font | Available |
| Author | Fonts by Gie Studio - Giwi Dodo - Personal-use only. For commercial use please contact owner. |
| Categories | Regular |